
Two days before Thanksgiving, Navy Secretary John Phelan announced the cancellation of the $22 billion, 20-ship Constellation Multi-Mission Frigate program. The ship was to be capable of conducting anti-air, anti-surface, anti-submarine and electromagnetic warfare both in coastal areas and in the open sea. The Navy had already spent nearly $2 billion of Congress’s $7.6 billion…
To build ships faster, the Navy needs to change how it designs them

